Reduce dust formation, decrease mixing times.

CLIENT:
Chemical Manufacturer
LOCATION:
Mount Gambier, South Australia
The Problem
Changing from uploading 20kg bags of urea pellets off a pallet on top of a tank and slashing open bags.
The Challenge
Generated a lot of dust, long mixing times, labour intensive and downtime for a forklift.
Mixquip Solution
Mount Mixquip Series 620-3 37kW at ground level and use bulka bags. Faster mixing times, Urea granules cheaper in bulka bags which saved costs as well as significantly faster batch times.